Chemech Consulting |  Dalgaranga Gold Project case study | Spartan Resources processing | gold plant assessment Dalgaranga

OUR TRACK RECORD

SPARTAN RESOURCES - DALGARANGA GOLD PROJECT

The Details

TIMEFRAME: 2022 - 2025

CLIENT: Spartan Resources (now Ramelius Resources) 

LOCATION: Western Australia

COMMODITY: Gold

SERVICES: Metallurgical Testwork Management |  Process Plant Design 

gold processing optimisation

TESTWORK MANAGEMENT

18 testwork programs

gold processing optimisation

DESIGN

Completed concept and prefeasibilty study designs

gold processing optimisation

CONTRIBUTION

Supported resource growth to 2.3Moz and a 21x share price increase

Project Background

In October 2022, Chemech were engaged to assist Spartan Resources (Gascoyne Resources at the time) with metallurgical and processing issues at their Dalgaranga process plant. Soon after however, operations were shut down due to unfavourable economics, and Chemech were re-directed towards assisting with shutting down the plant, extracting the gold-in-circuit, generating a comprehensive care-and-maintenance plan, and progressing the metallurgical testwork.  

Chemech's Contribution

As Spartan had recently discovered the Never Never deposit, Chemech tookover management of the metallurgical testwork programs providing: testwork program design; sample selection; testwork scoping; technical support and guidance of the laboratory; flowsheet development and optimisation; scheduling and expediting; results interpretation and reporting; and generation of inputs to the process design criteria. Spartan grew their gold resource very rapidly and, as a result, 18 metallurgical testwork programs across four orebodies were completed in 2 years, supporting resource definition and process plant re-start studies.  

Spartan completed a number of in-house studies to assess processing of the newly discovered resources through an upgraded Dalgaranga plant and  Chemech were engaged to complete the process design and preliminary engineering for these studies. This included comprehensive assessments of the performance potential and integrity of the existing plant, as well as assessment of a number of throughput and flowsheet options. Concept, PFS and DFS studies were completed, with Chemech providing the metallurgical interpretation and process design for Spartan.  

Final Outcome

In 2½ years, Spartan grew their share price 21 times on the back of increasing their mineral resource to 2.3Moz. Chemech played an integral role in supporting Spartan during this journey, from closing Dalgaranga and extracting gold from the circuit, developing the care-and-maintenance plan to keep the plant in good condition, managing the metallurgical testwork for new ores, and completing the process design for concept and feasibility studies to process the new ores.  

Chemech were an important part of Spartan’s incredible 2-year journey following the discovery of the Never Never orebody and establishing a 2.3Moz gold resource. They managed our metallurgical testwork during this period and completed the process design for our options and feasibility studies. Chemech brought a level of experience, diligence and pragmatism to the team that gave great confidence in the outcomes and supported the rapid growth in Spartans value. It was great to have such a high-calibre independent resource that was completely aligned with our goals and objectives. 

 - Alex De Rossi, Spartan Resources General Manager, Technical Services 